Newheek manufacture high quality X Ray Grids.Welcome to purchase.
Email

HomeBlog ›Medical Grid Replacement Step 4: Testing and Verification

Medical Grid Replacement Step 4: Testing and Verification

Medical Grid Replacement Step 4: Testing and Verification
1. Ensure that all components are properly installed and connected before reconnecting the power supply and starting the device.
2. Perform the necessary tests to ensure that the new grid can work properly and filter out scattered rays. This can be done by performing a simulated check or using the test function on the device.
3. Verify that the performance and image quality of the device meet the requirements.
Xray grid
Return to How to replace medical grids?

Author:X Ray Grids Maker


(+86) 18653679166
service@newheek.com